INTRODUCTION
TECHNICAL PARAMETER
FAQ
About machine performance quality
1.      Q:  How to guarantee the quality of outsourcing parts?
     A:  First choice more than 2 suppler by tender, There are strict system and process for inspecting outsourcing parts. And there are outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.
2.      Q:  Which brand of electric part?
     A: Use world famous brands, Siemens, Omron, Toshiba, Schneider, ABB
Customer can specify the brand.
3.      Q:  How to control the quality?
     A:   There are inspectors for inspecting equipment quality and performance, after assembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.
About after-sales service
1.       Q: What is the warranty time?
      A:  2 years after machine arrived at factory
2.       Q:  How to solve the problem?
      A:  Within one hour after getting customer' problem, inform the solution way, there are three ways for different conditions.
       1, Which can be solved by phone or Email, it will be solved in two hours.
       2. Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem).
       3. Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.
Â
INTRODUCTION
TECHNICAL PARAMETER
FAQ
About machine performance quality
1.      Q:  How to guarantee the quality of outsourcing parts?
     A:  First choice more than 2 suppler by tender, There are strict system and process for inspecting outsourcing parts. And there are outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.
2.      Q:  Which brand of electric part?
     A: Use world famous brands, Siemens, Omron, Toshiba, Schneider, ABB
Customer can specify the brand.
3.      Q:  How to control the quality?
     A:   There are inspectors for inspecting equipment quality and performance, after assembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.
About after-sales service
1.       Q: What is the warranty time?
      A:  2 years after machine arrived at factory
2.       Q:  How to solve the problem?
      A:  Within one hour after getting customer' problem, inform the solution way, there are three ways for different conditions.
       1, Which can be solved by phone or Email, it will be solved in two hours.
       2. Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem).
       3. Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.
Â
The experimental platform should be flat and smooth, and the experimental cabinet should be sufficient to accommodate daily utensils and drugs. Other laboratory requirements include the capacity, layout, and performance of water, electricity, gas, etc. that meet the needs of laboratory work
Jilin HaoChen cleaning Engineering Technology Co., Ltd. is a technological innovation enterprise focusing on the pharmaceutical purification engineering industry. The enterprise has a superb purification engineering technical team and excellent construction force. The company has always pursued the service tenet of "safety first, quality-oriented, customer first and technology first". Many representative air purification projects have been established in Jilin Province, Heilongjiang Province, Liaoning Province and Inner Mongolia Autonomous Region. With a registered capital of 5.8 million yuan, the company has grade II qualification for professional contracting of Building Decoration Engineering; Grade II qualification for professional contracting of building electromechanical installation engineering.
Service Items:
Purification project of pharmaceutical clean workshop (pharmaceutical purification workshop, food purification workshop, electronic and chemical purification workshop, etc.)
Construction of purification operating room (hybrid integrated operating room, DSA operating room, laminar flow purification operating room, ordinary purification operating room, etc.)
Construction of ultra clean laboratory (microbiology laboratory, sterility laboratory, PCR laboratory, physical and chemical laboratory, P1, P2, P3 laboratory, etc.)
Construction of SPF animal feeding room purification project
Business items: medical purification color steel plate, supporting purification profile, air purification ventilation equipment, purification engineering supporting equipment, etc
At present, the company has 8 sets (pieces) of various large and medium-sized mechanical equipment, the original value of mechanical purification equipment is 4.6 million yuan, and the net value of mechanical purification equipment is 2.3 million yuan. The total annual construction output value is about 10 million yuan. Our company has 24 registered employees. Among them, there are 15 personnel with professional titles, 7 engineering technicians, 3 senior engineers, 5 engineers and 7 assistant engineers; 2 persons with economic management titles.
Morality first, customers first, safety first and economy first!
We look forward to working with you.
Microbiology Laboratory,Microbiology Lab,Bacteriology Laboratory,Microbiology Testing Laboratory