Plastic Cup Mould

Model NO.: RMBM16-01601322
Runner: Hot Runner
Design Software: UG
Installation: Semi Fixed
Standard: HASCO
Customized: Customized
Name: Plastic Cup Mould
Cav&Core Material: S136 / H13 or Other High HRC Material
Slider Material: S136 / H13 or Other High HRC Material
HRC: 46-48
Base Material: 45#
Hot Runner Brand: as Per Customer Request
Mould Life: 1,000,000 Shots
Polish System: Mirror Polish
Injection Machine: High Speed Injection Molding Machine
Sample Time: 45-60 Days
Trademark: REMO
Transport Package: Wooden Case
Specification: SGS certified
Origin: Taizhou China
HS Code: 8480719090
Plastic Thinwall cup mold

As a professional plastic mould manufacturer in China, we are specialized in opening new molds for various of plastic products. Our mould quotation will be made in 1 day and sent to consumers for reference. Quantity of mould and delivery time will be guaranteed.
Plastic Cup Mould
Plastic Cup MouldFollowing information is essential for your better understanding on our moulds

Name Description
Products' infomation we need to make quotation Clear Pics/material/size/weight/wall thickness/targetting quantity and etc.
Mould Material 45#, 50#, P20, H13, 718, 2738, NAk80, S136, SKD61 etc.
Mould Base LKM, HASCO etc.

Cavity Single/multi
Runner Hot/cold
Mould Design 3D/2D Drawing
Design Days 3 day
Design Software UG, PROE, CAD, CAE, CAM, CAXA etc.
Plastic Material PP, PC, PS, PE, PU, PVC, ABS, PMMA etc.
Mould Life 300, 000-3, 000, 000 shots
Injection System Pin-point-gate
Polish System Mirror Polish
Payment 40% of Deposit by T/T, 60% of Balance by T/T
Delivery Time 15-60days
Specification Depends on customers requirements
Business Step 
1. R& D We support customer R& D. Make the files or improve the design if you needed 
↓ ↓ ↓
2. Quotation Making Mould Quotation will be finished in 1 day according to information we get
↓ ↓ ↓
3. Negotiation  The quality, price, material, delivery time. payment item. ect 
↓ ↓ ↓
4. Mould Design  3-5 days for mould and product 3D/2D drawing design
↓ ↓ ↓
5. Mould According to customers' request to build the mould. Before make the mould. we send mould design to customer approval first. Mould will be usually finished in 25-60 days 
↓ ↓ ↓
6. Mould Testing When moulds are finished, we will test the moulds to check it satified consumers' needs. And we will send samples for consumers' reference.
↓ ↓ ↓
7. Sample shoot  If the first sample come out is not satisfied customer. we modify the mould and until meet customers satisfactory 
  ↓ ↓ ↓  
8. Delivery  Delivery goods by sea or by air, according  customers requirement 

The machine has a safe and reliable electro-hydraulic execution and control system that allows each duty cycle to be selected in manual, semi-automatic and automatic modes.It belonging to no cutting processing equipment. It does not reduce the toughness and impact toughness, and keeps the strength of the threaded part and the rod consistent. It solves the disadvantage of reducing the tensile force and impact toughness due to the peeling of the lathe. It is a special equipment for processing the anchor bolt, which can perfectly replace the lathe.

Feeder For Thread Rolling Machine

Roller Threading Machine,Thread Rolling Machine Feeder,Bolt Thread Rolling Machine,Feeder For Thread Rolling Machine

Borong Machinery Manufacturing CO. LTD , https://www.boronjx.com