Project Name: Zhongguancun Digital TV Industrial Park Project, Haidian District, Beijing (2011-2012, 1.375 billion)
Progress Stage: Environmental Impact Assessment Region: Beijing Construction Period: 2011-2012 Major Equipment: Cranes, Building Materials, Exterior Wall Decoration Materials, Door and Window Glass, Sanitary Ware, Elevators, Cranes, Waterproof and Anticorrosive Materials, Paint Coatings, Valve Components , Ceramic products, water supply and drainage systems, fire protection systems, pipe fittings, water supply equipment, outdoor drainage, construction electrical, lighting fixtures, low-voltage electrical appliances, wire and cable, weak current systems, lightning protection systems, buck power distribution cabinets, steel structures. (for reference only)
Project Description:
The project is located at No. 2, Huayuan Road, Haidian District, Beijing. The new project of Zhongguancun Digital TV Industrial Park in Haidian District, Beijing is divided into three phases. The total construction land area is 60070 square meters and the total construction area is 210,144 square meters. The total investment of the project is 1,375.9 million yuan.
Progress Stage: Environmental Impact Assessment Region: Beijing Construction Period: 2011-2012 Major Equipment: Cranes, Building Materials, Exterior Wall Decoration Materials, Door and Window Glass, Sanitary Ware, Elevators, Cranes, Waterproof and Anticorrosive Materials, Paint Coatings, Valve Components , Ceramic products, water supply and drainage systems, fire protection systems, pipe fittings, water supply equipment, outdoor drainage, construction electrical, lighting fixtures, low-voltage electrical appliances, wire and cable, weak current systems, lightning protection systems, buck power distribution cabinets, steel structures. (for reference only)
Project Description:
The project is located at No. 2, Huayuan Road, Haidian District, Beijing. The new project of Zhongguancun Digital TV Industrial Park in Haidian District, Beijing is divided into three phases. The total construction land area is 60070 square meters and the total construction area is 210,144 square meters. The total investment of the project is 1,375.9 million yuan.
Construction Unit: Beijing Peony Electronics Group Postal address: No. 2 Huayuan Road, Haidian District Postcode: 100000
Contact: Guo Yue Tel
Design institute: Beijing Municipal Institute of Labor Protection (EIA)
Postal address: No. 55 Taoranting Road, Xicheng District, Beijing Postcode: 100054
Contact: Xu Mindian
Related news: Tower crane Infrastructure information
Rigging Hardware,Eye Grab Hook,Clevis Slip Hook,Clevis Slip Hook With Latch
Yangzhou Jieerte Steel Cable Co., Ltd , https://www.nbjieertesteelcable.com