The main shaft has a diameter of 3.88 meters and a depth of 353.8 meters. The wellbore is equipped with a lifting load signal cable. The mining commission decided to add a production monitoring cable (cable length 600m). After resea…
From February 28 to March 2, the 7th Beijing International Bus and Parts Exhibition took place at the Beijing Exhibition Hall. Yuchai Group part…
Nowadays, the production configuration without industrial robots is unimaginable, and the range of applications of robots continues to increase. But because the automation plant expects a permanently stable multi-axis motion, the cable that drives the robot will be under extre…
Red gold ore sample is ground to a fineness -74μm95%, the magnetic separator to magnetic separation, the magnetic field intensity of 0.7T. The magnetic separation results showed that the m…
First, the process.
Figure 1.
…
The 1st session of the 13th National People's Congress was opened at 9 am on t…